Dutcher Construction Geothermal System

dutcher-house

 

Project Info:

5300 SQ Foot Log Cabin – Installation of water to water 14 ton geothermal system. The loop field consisted of 7000 feet of horizontal piping. The interior of the house has a water holding tank, hot water tank, buffer tank, three heat pumps (2 – 5 ton heat pumps and 1 – 4 ton heat pump), and a distribution manifold. Additionally, the ductless fan coil provides heating and cooling.